
106 St station entrance / Supplied rendering
01 / Street & station
Project particulars
SECTOR
Transportation + Civic + Cultural
ROLE
Architectural sub-consultant to the Phase 2 Partnership
LOCATION
New York, NY
STATUS
Construction Documents
SCOPE
Design Development & Construction Documents
Team
WSP USA
STV Incorporated
CLIENT
MTA
General Contractor
-
BIM platform
OpenBuildings Designer
The project
Delivering Better Transit for East Harlem.
Seo Architect PLLC is engaged as an architectural sub-consultant to the Phase 2 Partnership for the Second Avenue Subway Extension from 96th Street to 125th Street, encompassing three new stations.
Our office is contributing to both the design development and construction document phases, utilizing OpenBuildings Designer(BIM) to develop detailed drawings and ensure design precision.
Through this collaboration, we support the delivery of high-quality documentation and strengthen the project’s overall design and constructability.
Transportation architecture operates at two scales: the infrastructure of a city and the everyday experience of the individual. Clear spatial organization, a legible street presence and carefully coordinated details bring these scales into dialogue.

02 / The civic threshold
Transit within the streetscape.
A closer look
A clear presence.
A civic connection.
The supplied rendering frames the station entrance as a threshold between the sidewalk and the transit network. A transparent enclosure and articulated canopy create a distinct civic presence while maintaining a visual connection to the surrounding streetscape.
Project facts and participation credits are drawn from Seo Architect’s official project profile. The supplied image is a rendering, not a completed-project photograph. Architectural commentary is editorial interpretation. All rendering copyright reserved by MTA Construction & Development.
Start a conversation
What are we building next?
OFFICE
39 West 32nd Street, Suite #903
New York, NY 10001
USA

